“There has been a strong push for quite some time to get coal power out of Maryland. In this accelerated timeline of exiting from coal-fired power plants in the coming 12 to 24 months, I think it’s going to create a major reliability concern for the state. The loss of power poses a real danger to the well-being and livelihoods of Maryland families and businesses. Until these current risks to our grid are fully dealt with, it’s a mistake to close reliable, baseload power plants too soon. That should be a concern to consumers in Maryland and businesses in Maryland that rely on dependable power.”
What Others Are Saying
Below is a collection of quotes from industry experts, policymakers, officials, and others on various electrical grid issues. Use the filters below to find perspectives on topics like coal retirements, reliability, regulations and more.
Quote Filter
Leaders
Topics
Search
- Christopher Summers
- President
- Maryland Public Policy Institute
- Fox Interview
- 12/07/2023
“When it comes to concerns with the rules, one of the things that I would put forward is that timeline is one of the most important aspects when it comes to the infrastructure and technology available to it. When you look at where SRP is located out in Arizona, I would refer you to the SunZia transmission line. This transmission line between New Mexico and Arizona has taken more than 16 years to get permitted. And I think I would use that as an example of where you have adequate investment, you have interest and desire by energy entities are really just out in the west we have a significant amount of federal land and that adds to the permitting requirements, the siting requirements to actually get infrastructure built. So, while we understand and appreciate the mission that EPA is trying to accomplish, we think it needs to be met with the practicality of trying to turn plans no matter how ambition in into reality and infrastructure.”
- Bobby Olsen
- Associate General Manager
- SRP
- FERC 2023 Reliability Technical Conference
- 11/09/2023